SUPPLEMENTAL / BID BULLETIN

Addendum No. IB 2017-032-05

Subject:  “Supply, Delivery, Installation, Testing, Training and Commissioning of Severe Weather Early Warning System Based on Total Lightning Detection”; ABC Php120,000,000.00 / PR No. 2017-05-0449 / Ref. No. IB 2017-2017-032

This Bulletin is hereby issued to amend and/or modify certain provisions in the bidding documents of the above-entitled project as a result of the 2nd Pre-bid Conference conducted on 19 September 2017.

I.     Deliverables listed below shall be stated in the Detailed Cost Breakdown:

Qty./Unit

Description

Unit Cost             (in Php)

Total Cost

(in Php)

Hardware

28 sets

Lightning Detection Station

28 sets

Automatic Weather Station

28 sets

Solar Backup Power

1 lot

Shipping and taxes

Software and cloud-based access for 10 years (tax included)

10 years

Lightning Detection Network Data Management System

10 years

Mesoscale AWS Data Management System

10 years

Sensor-based Weather Forecasting System

10 years

Real-time Weather Data Display System

1 set

Database Server (included in the software bundle to be installed at PAGASA Data Center)

Professional services (tax included)

1 lot

Professional fee, planning, installation (includes fees of technical personnel from vendor for Installation at site, configuration and conduct of local training)

Factory Site Acceptance Test for 4 pax

Factory Site Training for 4 pax

Local site Training for 15 pax

Operation and maintenance for 10 years

This shall form an integral part of the Bid Documents.

For information and guidance of all participating bidders.


                   (Sgd.)
ENGR. CATALINO L. DAVIS
  Chairperson, PAGASA-BAC