Logo
Print
14 December 2017

SUPPLEMENTAL / BID BULLETIN

Addendum No. 2017-060-01_INF; 2017-061-01_INF; 2017-062-01_INF

Subjects:

1. Design and Build Scheme for the Establishment of Cataingan, Masbate Doppler Weather Surveillance Tower including Provision for Water Supply System and 37.5KVA, 220 VAC, 1-ø Commercial Electric Power Supply, Electrical Service Entrance Post, Office Furniture, Fixtures, Perimeter Fence, Public Comfort Room, Security Guard House and Access Road; ABC Php25,300,000.00 / PR No. 2017-11-0992

2. Design and Build Scheme for the Establishment of Laoang, Northern Samar Doppler Weather Surveillance Tower including Provision for Water Supply System and 37.5KVA, 220 VAC, 1-ø Commercial Electric Power Supply, Electrical Service Entrance Post, Office Furniture, Fixtures, Perimeter Fence, Public Comfort Room, Security Guard House and Access Road; ABC Php25,300,000.00 / PR No. 2017-11-0993

3. Design and Build Scheme for the Establishment of Agno, Pangasinan Doppler Weather Surveillance Tower including Provision for Water Supply System and 37.5KVA, 220 VAC, 1-ø  Commercial Electric Power Supply, Electrical Service Entrance Post, Office Furniture, Fixtures, Perimeter Fence, Public Comfort Room, Security Guard House and Access Road; ABC Php25,166,000.00 / PR No. 16-0902
 
This Bid Bulletin is hereby issued to all prospective bidders to amend and/or modify certain provisions in the bidding documents of the above-entitled project as a result of the Pre-bid Conference conducted on 08 December 2017, to wit:

I.  Schedule of Bidding Activities:

Activities

From

To

§ Issuance of Bidding Documents

29 Nov. - 19 Dec. 2017

29 November - 28 December 2017 / from 9:00 a.m. to 4:00 p.m. / Procurement Unit, 3/F

§ Submission of Envelopes 1 & 2

20 December 2017

29 December 2017 / on or before 1:00 p.m.  / PAGASA BAC Office

§ Opening of Envelopes 1 & 2

20 December 2017

29 December 2017 / 1:01 p.m. for Cataingan; 2:01 p.m. for Laoang and 3:01 p.m. for Agno

Venue: Amihan Conference Room, 2/F

 

II. Additional Information/Clarifications:

§  Participating Bidders shall submit preliminary engineering plans as part of their bid proposals.

§  Detailed Unit Price Analysis (DUPA) and Spreadsheet/Summary shall also be required.  Digital copy must be included in the CD.

§  The winning Contractor shall submit all the detailed engineering plans upon award of the contract.

For information and guidance of all prospective bidders.

 
(Sgd.)
ENGR. CATALINO L. DAVIS
Chairperson, PAGASA-BAC